图片名称
+

SHKH steel shell cross flow open cooling tower

In the high temperature difference (HIGHRANGE), that is, the temperature difference between hot and cold water exceeds 18 degrees, because the hot water needs to reduce the temperature by more than 18 degrees in a short period of time, it is necessary to have sufficient time for contact with the air of the filler, so the filler must be done. high. (actually equivalent to secondary, tertiary cooling)

Hotline:

Product Description

Product Features

In the case of high temperature difference (HIGHRANGE), that is, if the temperature difference between hot and cold water exceeds 18 degrees, since the hot water needs to reduce the temperature by more than 18 degrees in a short period of time, it is necessary to have sufficient contact time with the filler air, so the filler should be Do it very high. (actually equivalent to secondary, tertiary cooling);

Because the wind and water of the cross-flow tower are cross-flow, the resistance is only related to the diameter and depth, not to the height, so theoretically it can be very high;

The packing of the countercurrent tower cannot be made very high, and the wind and water convection, generally above 1.5MI, may cause air resistance. For example, color coating and galvanizing cooling in steel mills, and cross-flow towers can be used in rubber factories where hot water needs to be reduced from 55 degrees to 35 degrees or lower;

The water tower made of SKS steel has a packing height of 5.5M and a cooling temperature difference of 25 degrees; it is the papermaking process of APP Jinguang Group, using a 4000T/H single-cell cross-flow tower with a packing height of 15M;

In the case of sewage, the cross-flow tower can use grid packing, and it can be easily cleaned at any time without downtime; although the counter-flow tower can use grid packing, there are problems in cleaning, and in practical projects, sewage is often accompanied by high temperature, Therefore, the cross-flow tower can be used in two ways.

Parameter list

Parameters

Water volume m3/h

Model

Standard Dimensions Air volume Blade diameter Motor power Height into the tower Open tower interface diameter weight Noise value
In and out of water Overflow Sewage Hydration Self weight Run heavy Standard point
37~32℃ Long (L) width (W) height (H) m3/h mm KW mH2O DNmm DNmm DNmm DNmm KG KG KG
28℃ mm mm mm
SHKH-50 50 1500 3200 3200 33000 1200 1.5 3.8 100 50 40 20 670 1475 58
SHKH-65 65 1880 3200 3200 40000 1200 2.2 3.8 100 50 40 20 740 1685 58
SHKH-80 80 1880 3400 3200 56000 1500 3 3.8 125 65 40 20 880 2040 59
SHKH-100 100 2180 3400 3700 60000 1500 3 4.2 125 65 40 20 1150 2350 59
SHKH-125 125 2180 3800 3700 79000 1800 4 4.2 150 80 40 20 1250 2550 59
SHKH-150 150 2680 3800 3700 100000 1800 4 4.2 150 80 40 20 1350 2850 59
SHKH-175 175 2680 4200 3700 105000 2200 5.5 4.2 200 80 40 20 1520 3130 60
SHKH-200 200 2680 4200 4500 125000 2200 7.5 5.1 200 80 40 25 1620 3770 60
SHKH-225 225 3000 4200 4500 130000 2200 7.5 5.1 200 80 40 25 2080 4300 60
SHKH-250 250 3000 4500 4500 175000 2500 7.5 5.1 200 80 40 25 2200 4870 61
SHKH-300 300 3000 5000 4500 185000 2500 7.5 5.1 200 80 40 25 2550 5300 61
SHKH-350 350 3300 5500 4800 200000 2950 11 5.4 250 80 40 40 2850 6200 61
SHKH-400 400 3300 5500 5400 220000 2950 11 6 250 80 40 40 3250 6600 62
SHKH-450 450 3800 5550 5400 235000 2950 11 6 250 80 50 40 3550 7400 62
SHKH-500 500 3800 6000 5600 305000 3400 15 6 300 80 50 40 4050 8200 63
SHKH-600 600 4600 6000 5600 335000 3400 15 6.2 300 80 50 50 4650 9800 63
SHKH-7O0 700 4600 6200 6000 395000 3600 18.5 6.5 300 80 50 50 5050 10500 64
SHKH-800 800 5100 6200 6000 455000 3600 22 6.5 300 80 50 50 5450 115000 65

Note: The parameter changes caused by equipment modification will not be notified beforehand. The specific parameters are mainly based on our plan.

+

SHKH steel shell cross flow open cooling tower

In the high temperature difference (HIGHRANGE), that is, the temperature difference between hot and cold water exceeds 18 degrees, because the hot water needs to reduce the temperature by more than 18 degrees in a short period of time, it is necessary to have sufficient time for contact with the air of the filler, so the filler must be done. high. (actually equivalent to secondary, tertiary cooling)

Hotline:

Product Description

Product Features

In the case of high temperature difference (HIGHRANGE), that is, if the temperature difference between hot and cold water exceeds 18 degrees, since the hot water needs to reduce the temperature by more than 18 degrees in a short period of time, it is necessary to have sufficient contact time with the filler air, so the filler should be Do it very high. (actually equivalent to secondary, tertiary cooling);

Because the wind and water of the cross-flow tower are cross-flow, the resistance is only related to the diameter and depth, not to the height, so theoretically it can be very high;

The packing of the countercurrent tower cannot be made very high, and the wind and water convection, generally above 1.5MI, may cause air resistance. For example, color coating and galvanizing cooling in steel mills, and cross-flow towers can be used in rubber factories where hot water needs to be reduced from 55 degrees to 35 degrees or lower;

The water tower made of SKS steel has a packing height of 5.5M and a cooling temperature difference of 25 degrees; it is the papermaking process of APP Jinguang Group, using a 4000T/H single-cell cross-flow tower with a packing height of 15M;

In the case of sewage, the cross-flow tower can use grid packing, and it can be easily cleaned at any time without downtime; although the counter-flow tower can use grid packing, there are problems in cleaning, and in practical projects, sewage is often accompanied by high temperature, Therefore, the cross-flow tower can be used in two ways.

Parameter list

Parameters

Water volume m3/h

Model

Standard Dimensions Air volume Blade diameter Motor power Height into the tower Open tower interface diameter weight Noise value
In and out of water Overflow Sewage Hydration Self weight Run heavy Standard point
37~32℃ Long (L) width (W) height (H) m3/h mm KW mH2O DNmm DNmm DNmm DNmm KG KG KG
28℃ mm mm mm
SHKH-50 50 1500 3200 3200 33000 1200 1.5 3.8 100 50 40 20 670 1475 58
SHKH-65 65 1880 3200 3200 40000 1200 2.2 3.8 100 50 40 20 740 1685 58
SHKH-80 80 1880 3400 3200 56000 1500 3 3.8 125 65 40 20 880 2040 59
SHKH-100 100 2180 3400 3700 60000 1500 3 4.2 125 65 40 20 1150 2350 59
SHKH-125 125 2180 3800 3700 79000 1800 4 4.2 150 80 40 20 1250 2550 59
SHKH-150 150 2680 3800 3700 100000 1800 4 4.2 150 80 40 20 1350 2850 59
SHKH-175 175 2680 4200 3700 105000 2200 5.5 4.2 200 80 40 20 1520 3130 60
SHKH-200 200 2680 4200 4500 125000 2200 7.5 5.1 200 80 40 25 1620 3770 60
SHKH-225 225 3000 4200 4500 130000 2200 7.5 5.1 200 80 40 25 2080 4300 60
SHKH-250 250 3000 4500 4500 175000 2500 7.5 5.1 200 80 40 25 2200 4870 61
SHKH-300 300 3000 5000 4500 185000 2500 7.5 5.1 200 80 40 25 2550 5300 61
SHKH-350 350 3300 5500 4800 200000 2950 11 5.4 250 80 40 40 2850 6200 61
SHKH-400 400 3300 5500 5400 220000 2950 11 6 250 80 40 40 3250 6600 62
SHKH-450 450 3800 5550 5400 235000 2950 11 6 250 80 50 40 3550 7400 62
SHKH-500 500 3800 6000 5600 305000 3400 15 6 300 80 50 40 4050 8200 63
SHKH-600 600 4600 6000 5600 335000 3400 15 6.2 300 80 50 50 4650 9800 63
SHKH-7O0 700 4600 6200 6000 395000 3600 18.5 6.5 300 80 50 50 5050 10500 64
SHKH-800 800 5100 6200 6000 455000 3600 22 6.5 300 80 50 50 5450 115000 65

Note: The parameter changes caused by equipment modification will not be notified beforehand. The specific parameters are mainly based on our plan.

Inquiry

Professional research and development and manufacture of water cooling equipment

图片名称

Scan and follow us


Copyright © 2022 Wuxi Deep Sea Heat Transfer Technology Co., Ltd.      Website building:www.300.cn    苏ICP备2022022961号-1

SEO